File #: PP-19-04    Version: 1 Name:
Type: Subdivisions Status: Passed
File created: 2/7/2019 In control: Metropolitan Area Planning Commission
On agenda: 2/12/2019 Final action: 2/12/2019
Title: PRELIMINARY SUBDIVISION: The Orchard Phase I Michael Boggs of Tralan Engineering, LLC on behalf of owner No Rest, LLC request MAPC Approval of a Preliminary Subdivision Approval for 66 proposed lots on 19.70 +/- acres, within the RS-8 Single Family Residential District with a Limited Use Overlay of 7,100 square foot lot minimum located on Flemon Road.
Attachments: 1. The Orchard Phase 1 Subdivision Plans.pdf, 2. Staff Report.pdf, 3. Overall Layout.pdf, 4. Layout Plan.pdf, 5. Plans.pdf, 6. SWPPP Large Site.pdf, 7. Legislation Details (With Text).pdf

Title

PRELIMINARY SUBDIVISION:  The Orchard Phase I

 

Michael Boggs of Tralan Engineering, LLC on behalf of owner No Rest, LLC request MAPC Approval of a Preliminary Subdivision Approval for 66 proposed lots on 19.70 +/- acres, within the RS-8 Single Family Residential District with a Limited Use Overlay of 7,100 square foot lot minimum located on Flemon Road.