title
BA Engineering contract to provide a hydrologic comparison between the Corps of Engineers model study and Carter-Burgess model study for each drainage area within each creek basin
body
BA Engineering was awarded the contract to provide a hydrologic comparison between the Corps of Engineers model study and Carter-Burgess model study for each drainage area within each creek basin. The contract amount is for $25,000 per creek basin for hydrologic comparison and $10,000 per creek basin for preliminary review of water surface profiles. The resolution number is 2006:95 and was approved by the City Council on July 26, 2006.
Attachments included are:
Resolution
Contract