#1 SP92-18 Ruben Griffin, Griffin Oil Company, requested approval of site plans for a new convenience store and car wash. The principal building contains 2.200 sq. ft. and is located on the southeast corner of Stadium Boulevard and Fox Road.
Mr. McCracken made a motion to approve the request subject with the following stipulations:
1. Designation of a minimum of 11 parking spaces.
2. Elimination of the culvert on Fox Road that is not needed.
3. Closing the ditch with culvert on Stadium Blvd. with some type of drainage inlets being installed for water to get into the culvert.
4. Revision of the plans to exclude the lot that is not a part of this site and include the changes noted above.
The motion was seconded by Ms. Finley. Voting was 4 in favor, 0 opposed. REQUEST APPROVED WITH STIPULATIONS.
#2 SP92-19 Angelo Manufacturing requested approval of site plans for 5,000 sq. ft. expansion of an existing building and the construction of a new building containing 6,000 sq. ft. The property is located on the west side of Gee Street, south of Dan Avenue.
It was noted that currently the parking area is paved in front of the building but the drives were not hard surfaced. Angelo is expanding an existing building by 5,000 sq. ft. and is adding new 6,000 sq. ft. building to their operations. The addition will house a recycling plant for pallets and the new building will house milling operation where raw products will begin processing.
A motion to approve the site plan was made by Mr. Patteson subject to drives coming off Gee Street being paved to a depth of 40’ at least 24’ wide. Paving should be done to city specifications. The motion was seconded by Ms. Finley. Voting was 4 in favor, 0 opposed. REQUEST APPROVED WITH STIPULATIONS.
#3 MP92-25 Scott Arender requested approved of a one lot minor pla...