title
MAPC MINUTES
SEPTEMBER 12, 1989
body
MEMBERS PRESENT: Coleman, Blalock, Lamberth, Vance, Aycock, McCracken, Sloan
MEMBERS ABSENT: Patteson, Smock
The minutes of the August 8th 1989 meeting were approved as prepared.
#1 RZ89-29 Bracey & Associates requested a rezoning from R-1 to R-2 for Tract IV located on a part of the SW ¼, NW ¼ of Section 31, T14N and R4E, containing 0.77 acres, more or less. The property is located on the east side of South Culberhouse, south of Brentwood Subdivision.
A motion was made by Mr. Lamberth to approve the rezoning to R-2 because of the fact that there is a high probability that the commercial property to the south would be rezoned commercial and that this would be a good transition between the commercial property and the R-1 property. The motion was seconded by Mr. Aycock. Voting was three in favor, three opposed. Five affirmative votes are necessary for approval of a rezoning; therefore, REQUEST DENIED.
#2 RZ89-31 John Stump requested a rezoning from R-1 to I-1 for 8.70 acres, more or less, on a part of the NW ¼, NW ¼, Section 32, T14N and R4E. The property is located on the south side of Parker Road, east of Hwy. 1B.
A motion to approve this request was made by Mr. Vance with the stipulations that light manufacturing be stricken from the permitted uses on Lot 1 but not on Lot 2 and that the owner’s representative work out the drainage easement on the south side with the City Engineer. The motion was seconded by Mr. Aycock. Voting was 5 in favor, 1 opposed. REQUEST APPROVED WITH STIPULATIONS.
#3 RZ89-32 Tony Davis and Bob Lee requests a rezoning from R-1 to C-3 for 2.0 acres, more or less, on a part of the NW ¼, NW ¼, Section 29, T14N and R5E. The property is located on the south side of Highland Drive, west of Cottage Home Road.
A motion to table this request was made by Mr. Vance because of lack of representation. Mr. Lamberth seconded the motion. Voting was 5 in favor. 1 opposed. ITEM TABLED.
#4 RZ89-33 L.J. Boy...
Click here for full text