File #: ORD-62:2870    Version: 1 Name: Amend Code of Ordinances regarding street paving
Type: Ordinance Status: Passed
File created: 1/1/1962 In control: City Council
On agenda: Final action: 1/1/1962
Title: AN ORDINANCE AMENDING ORDINANCE NO. 737 AND CARROLL’S DIGEST SECTION 548; REGULATING THE BACK-FILLING AND RESURFACING OF EXCAVATIONS IN PUBLIC STREETS, ROADWAYS, AND ALLEYS; PROVIDING PENALTIES FOR VIOLATIONS THEREOF
Indexes: Code of Ordinances amendment, Policy - creation/amendment
Related files: ORD-46:001, MIN-62:001
title
AN ORDINANCE AMENDING ORDINANCE NO. 737 AND CARROLL’S DIGEST SECTION 548; REGULATING THE BACK-FILLING AND RESURFACING OF EXCAVATIONS IN PUBLIC STREETS, ROADWAYS, AND ALLEYS; PROVIDING PENALTIES FOR VIOLATIONS THEREOF
body
BE IT ORDAINED by the City Council of the City of Jonesboro, Arkansas:

Section 1: Section 3 of Ordinance No. 737, and Carroll’s Digest, Section 548, are amended to read as provided in the following sections.

Section 2: Any person, firm or corporation responsible for opening any trench or excavation within the confines of any public street, roadway or alley, or any public street, roadway or alley, or any person, firm or corporation holding a permit to make such opening, shall comply with the following requirements as to the filling or resurfacing of such excavations:

(1) All trenches opened within the confines of any public street, roadway or alley within the City of Jonesboro shall be backfilled with material suitable to obtain compaction of a density at least equal to that of the surrounding earth.

(2) Excavated materials may be used for backfill if such material is red or white clay, loam, sandy clay or sand and gravel. All back filled material shall be free of blue clay, gumbo, clods of earth, frozen earth, rocks over 3 inches in diameter, broken concrete, rubbish, brick, sod, or organic material.

(3) Backfill material shall be moistened and placed in six inch layers and tampered by hand or mechanical tampers to a density equal or greater than that of the surrounding earth.

(4) Water backfilling, pudding, or jetting may be used, in lieu of the tamping method when approved in writing by the City Engineer.

(5) Any pavement, hard surface or gravel surface removed for any excavation in public streets, roads or alleys shall be replaced with like material and bonded to the adjacent undisturbed surface.

Section 3: Acceptance or approval of any excavation work by the proper City official shall not prevent the City from asserting a clai...