File #: ORD-98:1488    Version: 1 Name: Amend Code of Ordinances concerning excavations
Type: Ordinance Status: Passed
File created: 6/1/1998 In control: City Council
On agenda: Final action: 6/15/1998
Title: AN ORDINANCE AMENDING JONESBORO CODE OF ORDINANCES CHAPTER 9.08, KNOWN AS EXCAVATIONS AND ALTERATIONS, BY AMENDING SECTION 9.08.03, EXCAVATIONS TO BE RESTORED, AND ADDING SECTION 9.08.04 LIMITS OF EXCAVATIONS.
Indexes: Code of Ordinances amendment, Policy - creation/amendment
Code sections: Chapter 58 - Streets, Sidewalks & Other Public Places
Related files: MIN-98:013
title
AN ORDINANCE AMENDING JONESBORO CODE OF ORDINANCES CHAPTER 9.08, KNOWN AS EXCAVATIONS AND ALTERATIONS, BY AMENDING SECTION 9.08.03, EXCAVATIONS TO BE RESTORED, AND ADDING SECTION 9.08.04 LIMITS OF EXCAVATIONS.
body
BE IT ENACTED AND ORDAINED, by the Jonesboro City Council that Chapter 9.08, known as Excavations and Alterations be amended as follows:

SECTION 1: 9.08.03 Excavations to be Restored. All material excavated for the street cut shall be removed and disposed of by the person, firm, or corporation performing said excavation. All excavations shall be restored with flowable fill to within 2" of the surrounding bituminous riding surface.

* The mix design for the flowable fill will be prepared by the Applicant. The mixture will be proportioned to produce a flowable mixture without segregation, material for one cubic yard, absolute volume, shall be as follows:
Cement - 80 - 100 lbs.
Fly Ash - 220 - 300 lbs.
Sand - Variable to equal 1 cubic yard Water - Approximately 65 gallons
The minimum flow shall be 8". The unit weight shall be a minimum of 110 lbs./cu. ft.

*If the surrounding riding surface is concrete, flowable fill shall be placed to within 6" of the riding surface.

The flow test shall consist of filling a 3" diameter x 6" high open-ended cylinder to the top with the flowable material mixture. If necessary, the top of the mixture will be struck off level. The cylinder will then be pulled straight up and the flow will be measured by the approximate diameter of the mixture.

Placing of either bituminous hot mix for asphalt surfaces or concrete for concrete surfaces over the flowable fill may begin after the flowable material has taken its initial set, is stable, and does not displace under equipment. A tack coat of liquid asphalt shall be applied to the cut face of the surrounding asphalt pavement before final hot mix surface is placed. Steel plates shall be used to maintain traffic over cuts before flowable fill is placed if...

Click here for full text