Legislation Details

File #: MIN-76:1692    Version: 1 Name:
Type: Minutes Status: Passed
File created: 6/10/1976 In control: Metropolitan Area Planning Commission
On agenda: Final action: 7/8/1976
Title: Minutes for the MAPC meeting on June 10, 1976.

title

Minutes for the MAPC meeting on June 10, 1976.

body

June 10, 1976

 

The Metropolitan Area Planning Commission met in regular session on Thursday, June 10, 1976 in the Court Room at City Hall.

 

The meeting was called to order by the Chairman, Mr. Ralph Morrison.

 

MEMBERS PRESENT: Morrison, Cooper, Ball, Gott, Brown, and Mrs. Morse.

 

MEMBERS ABSENT: Smith, Wheeless, and McDaniel.

 

OTHERS PRESENT: Joe Tomlinson, O.C. Pickens, Larry Fugate and Shirley Watkins.

 

Items for business were as follows:

 

#1.  A motion was made by Mr. Brown and seconded by Mr. Gott to APPROVE the minutes for May, 1976.  A vote was taken and the motion passed unanimously.

 

#2.  Dot Jackson requests a rezoning from Residential One to Commercial Four at the following described location.  The South 15.5 feet of Lot 2 and the North 39.5 feet of Lot 3 in Block B of the McCarth Addition to the City of Jonesboro, Arkansas.  The general location of this property is described as being on the east side of Franklin Street approximately 200 feet south of Nettleton Avenue.  A motion was made by Mr. Brown and seconded by Mr. Cooper to APPROVE the request.  A vote was taken and the motion passed unanimously.

 

#3.  Jonesboro Urban Renewal and Housing Authority requests a rezoning from commercial One to Residential Two at the following described location, Lots 13-1, 13-3, and 13-5 of the Jonesboro Urban Renewal and Housing Authority First Replat, Jonesboro, Arkansas.  The general location of this property is described as being on the east side of East Street between Cate and Creath Avenue.  This item was WITHDRAWN from the agenda.

 

#4.  Hillpoint Development Inc. requests final approval of Hunter’s Ridge Subdivision, Phase 3 and Phase 4 containing approximately 12 acres.  Preliminary approval was granted by the MAPC for Phase 3 in October 1975.  Preliminary approval for Phase 4 was granted by the MAPC in February 1976.  General location of this property is described as being bounded on the west by Arkansas State Highway No. 1, approximately 1700.0 feet north of the Highway 63 Bypass.  This item was WITHDRAWN from the agenda.

 

#5.  Marion Stringer requests final approval of a Property Development Plan which entails the placement o two buildings on a lot at the Southeast corner of North Culberhouse and Allen Streets.  A motion was made by Mr. Cooper and seconded by Mrs. Morse to APPROVE the request.  An amendment was requested by Mr. Gott and seconded by Mr. Brown to APPROVE the requests with the stipulation that there would be a requirement for placement of curb and gutters on Culberhouse and Allen Streets.  A vote was taken and the motion was passed unanimously. 

 

#6.  Village Communities requests preliminary approval of Candlewood Estates Fifth Addition.  General location of this property is described as being south of Candlewood estates 4th Addition and west of Candlewood First and Third Addition.  Contains 6.53 acres.  A motion was made by Mr.  Cooper and seconded by Mr. Ball to APPROVE the request.  A vote was taken and the motion was passed unanimously.

 

#7.  Guaranty of Jonesboro requests final approval of Scenic Hills Subdivision First Addition Revised.  Final approval was granted for this subdivision by the MAPC in September, 1975.  The MAPC is now asked to approve a revised plan containing several alterations.  General location of this property is described as being along the north side of Nettleton Avenue Extended and being north of the Briarwood Addition.  A motion was made by Mr. Cooper and seconded by Mr. Ball to APPROVE the request subject to the approval of the city engineer.  A vote was taken and the motion was passed unanimously. 

 

#8.  John White requests final approval of a plat of Rankin-White Plaza, First Addition.  General location of this property is described as being on the Southwest corner of Young and King.  Contains .62 acres.  A motion was made by Mr. Cooper and seconded by Mr. Ball to APPROVE the request.  A vote was taken and the motion was passed unanimously.

 

#9.  Jonesboro Properties Ltd. Request final approval of a replat of Lot 57, 58, and a part of 59, College Place Addition, Jonesboro, Arkansas into Lots 1 and 2.  General location of this property is described as being on the south side of East Johnson Avenue between State Street and unimproved Albright Street.   A motion was made by Mr. Brown and seconded by Mr. Gott to APPROVE the request.  A vote was taken and the motion was passed unanimously. 

 

#10.  Mr. Alton Holmes requests final approval of Alton Homes replat of a part of Lot 5 of Cobb and Lee Survey of the Northwest Quarter of Section 21, Township 14 North, Range 4 East.  General location of this property is described as being on the west side of Glendale Street approximately 150 north of Stallings Lane.  A motion was made by Mr. Gott and seconded by Mr. Brown to APPROVE the request.  An amendment was requested by Mr. Gott and seconded by ______ to APPROVE the request with the stipulation that suitable curb and gutter but installed along the east property line subject to the City Engineer’s approval.  A vote was taken and the motion was passed unanimously. 

 

#11.  After discussion the MAPC members requested the City Inspector to write the developers of the Viking Company requesting a statement from them as to their intentions in complying with all the stipulations for Valhalla Estates, specifically Ordinance #21-15 regarding drainage listed in the May 1976 MAPC minutes.  The City Inspector will report back to the MAPC within 10 days to 2 weeks.  A vote was taken and this recommendation was passed unanimously.

 

The meeting adjourned at 9:20 P.M.