Legislation Details

File #: MIN-08:133    Version: 1 Name:
Type: Minutes Status: Passed
File created: 5/29/2008 In control: Stormwater Management Board
On agenda: Final action: 6/18/2008
Title: Minutes for the Stormwater Management Board meeting on May 21, 2008.
Date Ver.Action ByActionResultAction DetailsMeeting DetailsVideo
No records to display.

title

Minutes for the Stormwater Management Board meeting on May 21, 2008.

body

STORMWATER MANAGEMENT BOARD                      MEETING MINUTES

 

Date:                     May 21, 2008

 

Location:                     Huntington Building

Conference Room #105

900 West Monroe

Jonesboro, AR 72401

 

Time:                     8:30 a.m.

 

Opening:                     Chairman Farmer called the meeting to order at 8:34 a.m.

 

In Attendance marked in bold

Members:

Dewaine Beisner

Todd Wilcox

Michael Daniels

Alec Farmer, Chair

Jerry Farris

Betty Shaw

John Street

Gene Vance, Vice-Chair

Jon Wilbanks

Dennis Zolper

 

Officials & Staff:

Doug Formon - Mayor

Tony Thomas - Project Administrator

Erick Woodruff - Public Works Director

Otis Spriggs - Director of Planning & Zoning

Craig Light - Chief City Engineer

Michael Morris - Civil Engineer

Tracey Cooper - Secretary

 

Others in Attendance:

Robert Hendrix

Harold Carter

Chad Delaney

                                                                                                                                                   

 

I.                     CALL TO ORDER

 

II.                     ROLL CALL

                     

III.                     APPROVAL OF MINUTES

 

A.                     Minutes for the April 16, 2008, Stormwater Management Board Meeting       

 

The minutes will be brought up at the next meeting for approval. (Attached)

 

IV.                     NEW BUSINESS

 

                     The Technical vacancy on the board was discussed and Light will get with the Mayor regarding this vacancy.

 

                     Light also noted that Farmer made a presentation to the Exchange Club on May 9th, the Engineering Department held a stormwater presentation for contractors and developers on May 6th, and four members of the Engineering staff will be attending a certification class in Hot Springs on June 6th.  Light announced the Engineering Department has a full-time stormwater inspector.  His name is Jerry Lee.

                                          

V.                     PENDING ITEMS

 

                     Light handed out a comment sheet for the Pending Items to be discussed. (Attached)  Light noted there are 12 points to consider for Reservoir Safety.  It was noted that these are just recommendations for the board to consider.  All of the listed items were discussed.  Light stated that Item #3 will be covered in the Emergency Spillway section. 

 

                     Light discussed the design criteria and exemptions for Emergency Spillways.  Zolper questioned if there was a general rule to determine where to start regulating emergency spillways.  Light will research to determine if there is a consensus in other areas.  Emergency spillways should not have to consider a Dam Breach Analysis if it is sized properly.

 

                     Light handed out the cover and table of contents of “Hydraulics of Bridges Waterways”  He suggested adopting this manual.  Bridges that span 20 ft. or more have to be designed using the standards but still have to meet FEMA guidelines.  These standards pertain to hydraulics not structural.

 

                     Daniels discussed lowest floor level.  He stated that the lowest and highest grade will affect insurance ratings.  Light will get information on insurance ratings.

 

                     Zolper ask if the model ordinance language was mandatory or suggested.  Light stated it was suggested and could be modified but it would have to be in compliance.  Zolper stated that both documents should be looked at and take the best from both and combine into one document.

 

The next meeting is the regularly scheduled meeting on Wednesday, June 18, 2008, at 8:30 a.m.  Items to be discussed are (1) cost savings per foot to increase above BFE - 2’ vs. 1’, (2) chart for safety and required amenities for Detention Ponds and Retention Ponds, and (3) decision making tool “in-lieu”.  

 

VI.                     STAFF REPORTS

 

VII.                     PUBLIC COMMENTS

 

VI.                     ADJOURNMENT

 

                     Chairman Farmer adjourned the meeting at 9:48 a.m.